1
/
of
1
SWITCH, ATM FUSE BYPASS, LONG LEAD
SWITCH, ATM FUSE BYPASS, LONG LEAD
Regular price
$67.10 USD
Regular price
Sale price
$67.10 USD
Unit price
/
per
Shipping calculated at checkout.
Switch, atm fuse bypass, long lead. This electrical part is used to build or repair circuits, where sizing, materials and secure connections decide how long the job lasts.
Before you order: Size wire for the current and the round trip length, use tinned marine wire and terminals, and protect each circuit with a fuse or breaker rated for the wire. The part number for this item is BX88272.
Specifications
- Part number: BX88272
Installation and care: Crimp with the correct tool, seal connections with adhesive lined heat shrink where moisture is present, and inspect regularly for corrosion.
Share
